| Submission date: |
|
| Entrepreneur's Country of Origin: |
Perú
|
| Round: |
1ª Ronda de Inversión en Perú
|
| Country of Project Execution: |
Perú
|
| Investment: |
1.200.000
|
| Currency: |
USD
|
Energetik Heart: This project involves the construction and assembly of a portable river to install a modular, closed-loop micro-hydroelectric power plant. Designed for the backyards of industries and mines, this system allows businesses to meet 100% of their energy needs with renewable power. It can reduce costs by 70% or more, minimize their carbon footprint, and provide independence from public power grids.


